Combustion Catalog | Fives North American

North American Air Heater Inquiry Form

Sheet 9545-1

Client:

_______________________________________________ Phone:

_________________________________

Address: _______________________________________________ Fax: _________________________________ _______________________________________________ Salesman: _________________________________ _________________________________ Known Competition: ________________________________________________________________________________________ Contacts: _______________________________________________ Office:

PROCESS AIR DATA:

  Client Process Fan

  New FNAC Blower

Source:

Volume: _________________________scfm (max.) Inlet Temperature: ________________F (max.) Outlet Temperature:_______________F (max.) Inlet Pressure: ____________________psi/osi/wc Outlet Pressure:___________________psi/osi/wc Oxygen Content: _________________% wet/dry Contaminants:

_________________________scfm (min.) _________________________F (min.) _________________________F (min.) _________________________positive/negative _________________________positive/negative

Describe: _____________________________________________

________________ % ________________ %

_____________________________________________ (use back side for additional information)

AIR HEATER DATA:

Energy Required (If known): Btuh Fuel(s): ____________________at ____________________ psi supply _____________________at ___________________psi supply Combustion Air Source:  Process Air  New Fives Blower Chamber Pressure Expected_______________________psi/osi/in.wc. Chamber Orientation:  Vertical  Horizontal Chamber Lining By FNAC  Yes  No If Yes, max. allowable shell temp__________ F If specific inlet and outlet sizes required, provide on back Total Volume Expected, including POC: ____________________scfm Quantity of Process Air Inlets: ___________________ Outlets: ____________ Power: ______________________ NEMA: _____________________ Altitude: __________________ Emissions: Low Emissions Technology Required?  Yes  No If Yes: Guarantee Required?  Yes  No If Yes: NOx _____________________ppm v CO ____________________ppm v SOx _________________ ppm v System Mounting Arrangement:  1 Skid with Chamber, Fuel Train, Panel, All Piping  2 Skids with Chamber on 1; Fuel train, Panel on 1; On Site Piping

 3 Units with Fuel Train Rack, Panel  All Loose Freestanding Components Specifications:

 Client Supplied

 Fives Standard  Layout Only

 None

 Everything

 Components Only

Approvals: Insurance:

 FM

 IRI

 Canada

 Other (explain on back)

Provide Sketches/More Data on Back

Made with FlippingBook flipbook maker