North American Air Heater Inquiry Form
Sheet 9545-1
Client:
_______________________________________________ Phone:
_________________________________
Address: _______________________________________________ Fax: _________________________________ _______________________________________________ Salesman: _________________________________ _________________________________ Known Competition: ________________________________________________________________________________________ Contacts: _______________________________________________ Office:
PROCESS AIR DATA:
Client Process Fan
New FNAC Blower
Source:
Volume: _________________________scfm (max.) Inlet Temperature: ________________F (max.) Outlet Temperature:_______________F (max.) Inlet Pressure: ____________________psi/osi/wc Outlet Pressure:___________________psi/osi/wc Oxygen Content: _________________% wet/dry Contaminants:
_________________________scfm (min.) _________________________F (min.) _________________________F (min.) _________________________positive/negative _________________________positive/negative
Describe: _____________________________________________
________________ % ________________ %
_____________________________________________ (use back side for additional information)
AIR HEATER DATA:
Energy Required (If known): Btuh Fuel(s): ____________________at ____________________ psi supply _____________________at ___________________psi supply Combustion Air Source: Process Air New Fives Blower Chamber Pressure Expected_______________________psi/osi/in.wc. Chamber Orientation: Vertical Horizontal Chamber Lining By FNAC Yes No If Yes, max. allowable shell temp__________ F If specific inlet and outlet sizes required, provide on back Total Volume Expected, including POC: ____________________scfm Quantity of Process Air Inlets: ___________________ Outlets: ____________ Power: ______________________ NEMA: _____________________ Altitude: __________________ Emissions: Low Emissions Technology Required? Yes No If Yes: Guarantee Required? Yes No If Yes: NOx _____________________ppm v CO ____________________ppm v SOx _________________ ppm v System Mounting Arrangement: 1 Skid with Chamber, Fuel Train, Panel, All Piping 2 Skids with Chamber on 1; Fuel train, Panel on 1; On Site Piping
3 Units with Fuel Train Rack, Panel All Loose Freestanding Components Specifications:
Client Supplied
Fives Standard Layout Only
None
Everything
Components Only
Approvals: Insurance:
FM
IRI
Canada
Other (explain on back)
Provide Sketches/More Data on Back
Made with FlippingBook flipbook maker