Combustion Catalog | Fives North American

Install and Maintenance | Safety Solenoid Valve

Bulletin R950-3690 Page 6

Visual Indicator, Install and Maintenance

TO INSTALL THE VI FOLLOW THE BELOW STEPS:

1. Close gas supply 2. Remove the 1⁄8 " plug from valve bottom

3. Introduce the rod of VI inside 1⁄8 " hole and screw the item with O-ring. 4. Tighten using open-ended spanner WAF15. Avoid overtightening. 5. Perform a leak test

Maintenace: Functional test once a year Service life: 10 years

WARNING: Situations dangerous to personnel and property may exist with the operation and maintenance of any combustion equipment. The presence of fuels, oxidants, hot and cold combustion products, hot surfaces, electrical power in control and ignition circuits, etc., are inherent with any combustion application. Components in combustion systems may exceed 160°F (71°C) surface temperatures and present hot surface contact hazard. Fives North American Combustion, Inc. suggests the use of combustion systems that are in compliance with all Safety Codes, Standards, Regulations and Directives; and care in operation.

CONTACT fna.sales@fivesgroup.com T +1 800 626 3477 - F +1 216 373 4237

Fives North American Combustion, Inc. 4455 East 71st Street - Cleveland, OH 44105 - USA www.fivesgroup.com

Made with FlippingBook flipbook maker