FDPN40Check Points for Installation STACKABLE PARTITION DOOR SYSTEM 614

Website for latest info

Make sure that the ceiling is strong enough to support a load of 160 kg (in the stacking part of the rail).

Max. load of 160 kg Sufficient reinforcement is needed before installation.

Max. load of 160 kg Sufficient reinforcement is needed before installation.

Upper track

Check the ceiling for sag and floor for wrap.

Add beam to increase support force.

Ceiling (Rail installation)

Height fluctuation should be less than 5 mm.

Floor

Process when recessing the rail.

400 Min. 48 [52]

540

Min. 48 [52]

Min. 48 [52]

Process in parallel and vertically

Process in parallel and vertically

FDPN40P

Dimension in [ ] denoted when cloth is added. FDPN40V

When processing without gap between ceiling face and rail • At first, install the rail to reinforcement material behind the ceiling. • Then, fix the ceiling face to meet rail mount dimensions.

Install rail

43

Process ceiling surface.

Min. 48 [52]

43

FDPN40 Caution STACKABLE PARTITION DOOR SYSTEM

• Particular strength is required for the locations where the panel is stored. Avoid installation in areas where sufficient strength is not ensured. Be especially careful when retrofitting, given that sufficient strength may not be available. • This product is intended for general residential applications, but can also be used for facilities, etc., when the usage conditions are similar. Do not use in locations such as public facilities where unspecified users at large will be opening and shutting the panel frequently, or outdoors. • Be sure to use a vibration stopper such as a flush bolt for the panel. In addition, be sure to fix the panel with a vibration stopper after moving the panel. When unfixed it may wobble, which is dangerous. • Do not apply load to the fixtures by colliding with, leaning on, or hanging from the panel. Also, do not try to move it forcibly or tilt it too far. Otherwise, the fixtures will be damaged, leading to unexpected injury. Mount on a post or ceiling strong enough to withstand the shocks of panel operation and door opening and closing, which will not sag under the panel and door weight. • Before mounting the fixtures, carefully check the body dimensions and status. Check the horizontal and vertical dimensions and make sure that the opening

height dimensions are consistent across the entire opening width, and that the ceiling and floor are smooth. • Be sure to check the Panel Notch Cut Out Dimensions and go over checks before installation (P.613, P.614).