AW23_RSA Unitary Book Complete.indd

rubber edging is touching the corner of the frame (as per #2) Only insert the corner of the graphic at this stage

5. Take bottom right corner of graphic and insert 20-30cm into corner of frame – again ensuring rubber edging is touching the corner of the frame (as per #2). O nly insert the corner of the graphic at this stage. 7. If any bunching occurs on any side, remove graphic on that side and re-do process again ging into es of the tting Guide Revised January 2014

8. Lightbox is installed correctly

8. Lightbox is installed correctly.

7. If any bunching occurs on any side, remove graphic on that side and re-do process again nsert remaining rubber edging into left, right and bottom edges of the graphic ght Box Fitting Guide Revised January 2014 7. If any bunching occurs on any side, remove graphic on that side and re-do process again 6. Insert remaining rubber edging into op, left, right and bottom edges of the graphic ght Box Fitting Guide Revised January 2014

8. Lightbox is installed correctly

8. Lightbox is i

6. Insert remaining rubber edging into top, left, right and bottom edges of the graphic. 7. If any bunching occurs on any side, remove graphic on that side and re-do process again. 7. If any bunching occurs on any side, remove graphic on that side and re-do process again 6. Insert remaining rubber edging into top, left, right and bottom edges of the graphic Light Box Fitting Guide Revised January 2014

8. Lightbox is installed correctly

Made with FlippingBook Digital Proposal Creator