THE SUCCESSFUL COMPLETION OF EACH LIFT DEMONSTRATED COOLTHERM’S EXPERTISE IN HANDLING COMPLEX INSTALLATIONS WITHIN SENSITIVE ENVIRONMENTS
CASE STUDY Royal Alexandra Children’s Hospital
LOW GWP REPLACEMENT
The Royal Alexandra Children’s Hospital in Brighton needed replacements for its aging chillers. The hospital required a solution that not only matched capacities of the existing system but also reduced the global warming potential (GWP) of the refrigerants used on-site. The project was executed in three distinct stages. This phased approach allowed for continuous assessment and ensured that the hospital’s cooling needs were met without any interruption. The strength of coordination between Cooltherm and our partners was essential to a successful project completion.
The location of the hospital’s chillers necessitated the need for a complex crane lift both to extract the old equipment and install the new – all without disrupting the hospital’s operations. To achieve this, three separate crane lifts were required to maintain operations and redundancy
throughout the installation process. The successful completion of each lift demonstrated Cooltherm’s expertise in
handling complex installations within sensitive environments. Cooltherm’s ability to manage both the specialised equipment and the intricate logistics of the crane lifts made us the ideal choice for this project.