COOLTHERM INSTALLED OVER
2.3MW OF COOLING CAPACITY
CASE STUDY Factory Studios, Manchester
COOLING A MAJOR ARTS VENUE
Cooltherm was appointed to deliver a cooling solution for The Factory in Manchester – a major arts venue designed to host a diverse range of cultural events. This new space required comfortable conditions for performers and audiences, without compromising on energy efficiency or environmental impact. With an area of 143,000sq. ft, and a peak heigh of 21m, keeping the space cool posed a significant challenge. Furthermore, any equipment installed could not interrupt an audience’s enjoyment of a performance – nor should servicing impact the performance schedule.
In total, Cooltherm installed over 2.3MW of cooling capacity, through a combination of 3 Turbocor chillers and 1 dry air cooler. This solution was designed in-house by Cooltherm project managers to tackle the challenge of the cavernous space. Moreover, integrated noise attenuation devices guarantee that there is minimal acoustic disruption, even with the chillers and coolers at full operational capacity.
Made with FlippingBook - Share PDF online