Cullen Technical Guide 2024

/

FMHI Dimensions (mm) continued

FMHI

FMHIR – RETURN

FMHIO – OFFSET

FMHIS – SKEW

ANGLE

W

R

H

H

H

H

W

W

W

Left hand version shown

Left hand version shown

FMHI–W–H Example: FMHI–75–225

FMHIR–W–H–R Example: FMHIR–100–225–100 (2mm added to return for tolerance)

FMHIO–W–H–OFFSET DIRECTION Example:

FMHIS–W–H–DIRECTION–ANGLE Example: FMHIS–75–225–L–45 FMHIS–100–250–R–67.5 (skews from 30–87.5º in 2.5º increments, with 5mm automatically added to ordered width to allow for tolerance)

FMHIO–75–225–R FMHIO–75–255–L

FMHID – DROPPED

FMHIST – STRADDLE

FMHIOR – OFFSET & RETURN

FMHIRS – SKEW & RETURN

ST

ANGLE

W

R

R

H

F

H

H

H

W

W

W

Right hand version shown

Left hand version shown

FMHID–W–H–F Example: FMHID–75–260–240

FMHIST–W–H–ST Example: FMHIST–75–225–100 (2mm added to straddle for tolerance)

FMHIOR–W–H–OFFSET DIRECTION–R Example: FMHIOR–75–225–R–100 (2mm added to return for tolerance)

FMHIRS–W–H–DIRECTION–ANGLE–R Example:

FMHIRS–75–225–R–45–100 FMHIRS–75–225–L–45–100

(skews from 30–87.5º in 2.5º increments, with 5mm automatically added to ordered width to allow for tolerance)

In Situ

— Suitable for use with Open Web Joists, I–Joists and trusses — Floor can be propped with acroprops and fully decked but must not be fully loaded until the masonry above has fully cured

— Where minimum of 3 courses (675mm) of masonry is required for hanger to achieve loads stated — The masonry above must be fully cured for 28 days prior to loading the floor — All hangers in this range do not provide restraint, therefore restraint straps may be required for joist applications (see pages 128 – 129)

The latest most up to date version will always be online and not in print or in downloaded pdf.

19

Technical support 01592 771132 / technical@itwcp.com / https://www.itwcp-offsite.co.uk

Made with FlippingBook Annual report maker