Cullen Technical Guide 2026

Floors

Standard Installation Instructions – Open Web Header HUH (Open Web Applications) Heavy Universal Hanger

Scan or click to view installation video

Stage 3

Stage 4

Stage 1

Stage 2

Wipe over top tabs to give a flush fit to the joist.

Nail top tabs into top chord of joist – Min 2No 3.4 x 35mm square twist nails into rear ply and 1No 3.4 x 35mm square twist nail into front ply per leg.

Position hanger flush with underside of joist.

Face nail to top and bottom chords using 14No 3.4 x 35mm square twist nails in total.

Enhanced Installation Instructions – Solid Header

Stage 3

Stage 4

Stage 1

Stage 2

Wipe over top tabs to give a flush fit to the joist.

Nail top tabs into top chord of joist – Min 2No 3.4 x 35mm square twist nails into rear ply and 1No 3.4 x 35mm square twist nail into front ply per leg.

Position hanger flush with underside of joist.

Fill all round and triangular nail holes to header joist with 3.4 x 35mm square twist nails.

HUH-W-220-235 Installation Guidance

1. Diamond nail holes are to be nailed for joist depths <= 225mm​ 2. Circular holes are to be nailed for joist depths >225mm ​​ *All circular holes on the face of the header must be nailed as standard, excluding the HUH-W-220-235 with joists over 225mm deep, where 6 circular holes at the top flange are replaced by 6 diamond holes.​ *Triangular holes are for Enhanced Installations

1.

2.

The latest most up to date version will always be online and not in print or in downloaded pdf.

39

Technical support 01592 771132 / technical@itwcp.com / https://www.itwcoe.com

Made with FlippingBook Annual report maker