Cullen Technical Guide 2024

/

UH (I–Joist Applications) Universal Hanger UH–300 & UZ–Clip – Installation

Stage 1

Stage 2

Stage 3

Fix UZ–Clip to top flange of supported member using: 2No 3.4 x 35mm square twist nails. 2No UZ–Clips required for double incoming.

Position hanger against face of I–Joist with locating tab tight to underside of joist. Backer block installed as per I–Joist manufacturer’s guidelines.

Offer incoming member into the UH hanger and fix to joist bottom flange/backer block and UZ–Clip to header member.

MHE & UZ–Clip – Installation

Stage 1

Stage 2

Stage 3

Fix UZ–Clips to top flange of supported member using: 2No 3.4 x 35mm square twist nails per UZ–Clip. 2No UZ–Clips required for double incoming.

Offer incoming member into the MHE hanger and fix to joist bottom flange/ backer block and UZ–Clip to header member.

Position hanger against face of I–Joist with locating tab tight to underside of joist. Backer block installed as per I–Joist manufacturer’s guidelines.

The latest most up to date version will always be online and not in print or in downloaded pdf.

56

Technical support 01592 771132 / technical@itwcp.com / https://www.itwcp-offsite.co.uk

Made with FlippingBook Annual report maker