Cullen Technical Guide 2024

/

Standard Installation Instructions – Open Web Header HUH (Open Web Applications) Heavy Universal Hanger

Stage 1

Stage 3

Stage 4

Stage 2

Position hanger flush with underside of joist.

Face nail to top and bottom chords using 14No 3.4 x 35mm square twist nails in total.

Wipe over top tabs to give a flush fit to the joist.

Nail top tabs into top chord of joist – Min 2No 3.4 x 35mm square twist nails into rear ply and 1No 3.4 x 35mm square twist nail into front ply per leg.

Enhanced Installation Instructions – Solid Header

Stage 1

Stage 3

Stage 4

Stage 2

Position hanger flush with underside of joist.

Fill all round and triangular nail holes to header joist with 3.4 x 35mm square twist nails.

Wipe over top tabs to give a flush fit to the joist.

Nail top tabs into top chord of joist – Min 2No 3.4 x 35mm square twist nails into rear ply and 1No 3.4 x 35mm square twist nail into front ply per leg.

The latest most up to date version will always be online and not in print or in downloaded pdf.

71

Technical support 01592 771132 / technical@itwcp.com / https://www.itwcp-offsite.co.uk

Made with FlippingBook Annual report maker