ERRIGAL RECLAD
Due to the on-going demand and critical importance of safe recladding of buildings across the UK and beyond, we have been focused on building our knowledge and expertise in this area and in 2020 have set up a specialist recladding division with a dedicated delivery team. We are equally adept at delivering one specific element of the process outlined below, to taking the lead on the whole project as a one-stop-shop. We are proud to have successfully delivered this service to many clients within the last year, with several projects in progress.
Stage One : Inspection We complete a thorough inspection of the existing façade. Cladding panels are removed and the existing system, insulation, fire barrier and support system is surveyed and a detailed report issued.
Stage Two : Design Our design team work with all involved from main contractors and clients to consultants and certifying bodies to: •Review the existing building line and interface requirements. •Review the design of the building and proposed re-clad materials to maintain the aesthetics of the building. •Develop the re-clad design details for the projects based on the architect’s intent. •Confirm structural analysis of proposed systems •Advise on compliance of systems to current standards and requirements on testing if required.
Errigal
Made with FlippingBook - Online catalogs