Barbirolli Square, Manchester

100 BARBIROLLI SQ

CLIENT: AEW Europe PM & QS: Savills ARCHITECTS: 5Plus Architects M&E CONSULTANTS: MZA

SIZE: 180,000ft 2 PROGRAMME: 78 weeks VALUE: £19M

Following the successful completion of 101 Barbirolli Square, Savills and AEW Europe then negotiated 100 Barbirolli through a 2-stage process under the JCT Standard Form of Contract with CDP portions. Through the early stages of the design development Ardmac was engaged to produce a cost plan, risk management plan, input on buildability, logistics, programming and VEing until RIBA Stage 4 where a fixed price was agreed. The major Cat A+ refurbishment project included the construction of an additional 11 th floor to the building and the infill of 50% of the 11-storey atrium to create additional ‘net’ floor area space.

The newly formed atrium was then clad with a Schuco glazed curtain walling system with a new bespoke manufactured glazed roof.

The high end fit-out works included all new state-of- the-art MEP including ‘Environmental Automatic Solar Dimming LED Lighting’, BMS and all new exposed services together with the complete refurbishment of the 11-storey building. The newly extended two-storey reception entrance included new curtain walling which created a stylish ‘grander’ entrance to the high end sophisticated new reception area.

On this challenging redevelopment project, it was mission critical that we could rely on a contractor that would pro-actively lead and deliver our challenging project to a superior standard. During tender process we were impressed with Ardmac’s professionalism and attention to detail throughout the whole process and preparation of the construction site and proposed works. We therefore selected them to run our exciting and challenging development project given they outperformed their peers and competitors. During the project and to date, we have been consistently impressed with the proactive nature of the Ardmac project team, quality of the construction and the delivery of the design team’s vision, to be critically on time and on budget. - Director - AEW Europe