THE SUMMER OF FREE PROMO
Other Home Inclusions
LUXE
Tender Period
12 months tender period from date of deposit
Construction Insurance
Construction insurance premium (home owners warranty)
Maintenance Period 90 day maintenance period
Pest Control
Pest control certification
Lighting
Light points including compact fluorescent globe
Smoke Detectors
Smoke detectors provided (direct wired with battery backup)
Hot Water System
Electric hot water system
Electrical Safety
Earth leakage electrical safety switch in single phase meter box
Electrical
2 x TV and 2 x Cat 6 data points
BASIX Assessment
BASIX assessment to State Government requirements
Glass Windows & Doors
Low-E Coated Glass to all aluminium windows and doors (excl. wet areas)
Upgrade insulation external walls to R2.7 Upgrade ceiling under roof insulation to R7 R2 acoustic insulation to all internal wet area walls (includes bathroom, laundry, powder room, and ensuite R4 insulation to floor joists (ceiling above ground floor, double storey homes only) Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions 10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan
Insulation
Mandatory Site Works
Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council
Clarendon Homes
Luxe Collection
5
Made with FlippingBook Publishing Software