T&Cs_Clarendon Homes Luxe_SOF 2026

THE SUMMER OF FREE PROMO

Other Home Inclusions

LUXE

Tender Period

12 months tender period from date of deposit

Construction Insurance

Construction insurance premium (home owners warranty)

Maintenance Period 90 day maintenance period

Pest Control

Pest control certification

Lighting

Light points including compact fluorescent globe

Smoke Detectors

Smoke detectors provided (direct wired with battery backup)

Hot Water System

Electric hot water system

Electrical Safety

Earth leakage electrical safety switch in single phase meter box

Electrical

2 x TV and 2 x Cat 6 data points

BASIX Assessment

BASIX assessment to State Government requirements

Glass Windows & Doors

Low-E Coated Glass to all aluminium windows and doors (excl. wet areas)

Upgrade insulation external walls to R2.7 Upgrade ceiling under roof insulation to R7 R2 acoustic insulation to all internal wet area walls (includes bathroom, laundry, powder room, and ensuite R4 insulation to floor joists (ceiling above ground floor, double storey homes only) Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions 10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan

Insulation

Mandatory Site Works

Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council

Clarendon Homes

Luxe Collection

5

Made with FlippingBook Publishing Software