T&Cs_Clarendon Homes Aspire_SOF 2026

THE SUMMER OF FREE UPGRADES

Other Home Inclusions

ASPIRE

Voucher

$30K Lifestyle Studio Voucher

Tender Period

12 months tender period from date of deposit

Construction Insurance

Construction insurance premium (home owners warranty)

Lifestyle Studio

Three dedicated days to carefully select the colours and finishes for your dream home, ensuring every decision is made with confidence and ease

Maintenance Period

90 day maintenance period

Pest Control

Pest control certification

Floor Tiles

Flush finish floor tiles to wet areas

Ligh Points

Light points including compact fluorescent globe

Smoke Detectors Hot Water System Electrical Safety

Smoke detectors provided (direct wired with battery backup)

Electric hot water system

Earth leakage electrical safety switch in single phase meter box

Electrical

2 x TV and 2 x Cat 6 Data points

BASIX Assessment Glass Windows & Doors

BASIX assessment to State Government requirements

Low-E Coated Glass to all aluminium windows and doors (excl. wet areas)

Upgrade insulation external walls to R2.7 Upgrade ceiling under roof insulation to R7 R2 acoustic insulation to all internal wet area walls (includes bathroom, laundry, powder room and ensuite) R4 insulation to floor joists (ceiling above ground floor, double storey homes only) Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions

Insulation

10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan

Mandatory Site Works

Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council

‘UNWRAP THE LUXURY' THE CHRISTMAS UPGRADES - ASPIRE AGREEMENT I/We have read and agree to be bound by the terms and conditions shown above for the Aspire upgrade items outlined in this promotion.

PURCHASER 

PURCHASER 

WITNESS

PLEASE PRINT NAME

PLEASE PRINT NAME

PLEASE PRINT NAME

SIGNATURE

DATE

SIGNATURE

DATE

SIGNATURE

DATE

*1 Clarendon Homes advises that the NSW State Government has implemented changes to BASIX requirements for all Contracts signed from 1st October 2023. This may affect the BASIX requirements and the way your home is assessed to meet those requirements. Any additional changes required to suit the new Government regulations will be at an additional cost by way of variation. *2 Prices are subject to, Bore Hole, Contour, Bushfire, RTA, Hydraulic Engineers or other Statutory reports as required by your 10.7 certificate, 88B or Site Manager. Up to 8m allowed to the relevant connection point with the exception of acreage designs which have 25m allowed. Clarendon Homes (NSW) Pty Ltd. ABN 18 003 892 706. BL 2298C. E&OE. Call 13 63 93 | Clarendon.com.au

ASPIRE HOME INCLUSIONS | 4

Made with FlippingBook Publishing Software