2020 strategic planning

PHILIPPINES

Mactan Rock Industries Incorporated (200 MW) - They need 200MW of power to produce 20,000 Cubic Meters per day of water to supply the entire island of Mactan. In order to be competitive, the price of power must be 6.00 Php per kilo-watt hours. They need this by the first quarter of 2020.

Papakits Lagoon and Marine Sanctuary (1 MW) - Resort located in Liloan Cebu. It is an adventure park and is getting its power from the local utility, VECO, at 10.50 Php per kilo- watt hours. This price includes distribution and transmission service fees.

Stakili Garden and Beach Resort. (500 KW) - Its a resort in Compostela town, north of Cebu City. They are getting their power from local utility, VECO, at 10.50 per kilo-watt hours .This price includes distribution and transmission service fees.

Nalusuan Island Resort and Marine Sanctuary (3MW) - This is an island resort located in Cordova, Mactan Island. They are being powered now with a diesel feed generator sets 24/7. ElQuator technology is best for them.

Mactan Cebu International Airport (20MW) - International Airport of Cebu, its one of the most modern airport of the Philippines. They're getting power from local utility, MECO, at 12.00 Php per kilo-watt hours including Distribution and Transmission charges. Power Stability is also a problem that they need to run generator sets in time of fluctuation which is frequent due to lack of power supply in the island.

Parklane Bohol Resort and Spa (1MW) - A resort hotel in Anda Bohol. They are getting from the electric cooperative, BOHECO, at 13 Php per kilo-watt hours including distribution and transmission charges. The problem is the stability of power, sometimes its high voltage and sometimes low, making their equipment vulnerable to failure.

Park Lane Internatonal Hotel (1 MW) - A Business Hotel located in Cebu City Business District. They are getting their power from local utility, VECO, at 10.50 per kilo-watt hours. This price includes distribution and transmission service fees.

Waterfront Hotels (3 MW)

The meeting has been confirmed and will be held on 16th and 17th December 2019 with the respective Government link companies in Cebu Island to discuss on to move ahead. Mr. Henrik Pryter and Mr.Victor Vitto will represent ElQuator to the meeting.

Made with FlippingBook - professional solution for displaying marketing and sales documents online