HOW TO INSTALL ROD RAIL STANDARD RAILING/ CONTINUED TREX SIGNATURE ®
6 ' Rail Spans or Shorter
11
11. Using pilot holes
(or marks), drill 1/4" holes for all vertical supports in both top and bottom rails.
9a
NOTE: Clean any burrs from edges of holes to ensure good fit on both sides.
Cutting Rods to Length (When Required)
9a.Measure the distance between the vertical end holes on both top and bottom rails . Mark the center. IMPORTANT NOTE: DO NOT mark the line across the entire width of the bottom rail, as it will be visible after install. Maximum recommended line width is 1".
12
Over 6' Rail Spans
9b
12. Measure the distance between the end (outer) holes (X") on top or bottom rail and add 3/8" to this measurement.
NOTE: If installed at exact spans, rods do not have to be cut.
9b.Measure the distance between the vertical end holes on both top and bottom rails . Divide the distance into thirds and make two marks on top and bottom rails.
13
/8"
NOTE: Maximum unsupported rod span is 32.25".
X" + 3
Locating and Drilling Midspan Holes
10
13. Cut rods to the length measured in previous step.
2
1
10. Using the slot on the HZ template, locate marked line and drill two 7/64" pilot holes (or mark with a punch). NOTE: Pilot holes will be drilled out larger in next step.
140 NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.
Made with FlippingBook - Online Brochure Maker