HOW TO INSTALL ROD RAIL STANDARD RAILING/ CONTINUED TREX SIGNATURE®
24
Attaching Foot Block (when required) Required ONLY for All Clear Span Applications over 6' (1.83 m). Included with 8' (2.44 m) railing kits.
20
2
24.Drop assembled rod rail panel into brackets.
Attaching Panel to Brackets 25.U sing a 7/64" (0.28 cm) drill bit, pre-drill through
20.Temporarily drop rod rail panel into brackets. To ensure correct location, place Foot Block under center of bottom panel. Mark to provide placement location of base. Once marked remove panel.
25
railing into bracket as shown for attachment of railing to bracket. Attach top rail to top brackets by using two self-tapping screws (provided) for each bracket.
2
21
7/64" (.28 cm)
1
NOTE: Pre-drilling is required. Its best practice to pre-drill a single hole, then attach screw, and continue in this order.
Inserting Rod Rail Stiffener – For Rail Sections Over 6'
21.Place base (smaller side facing down) on decking surface. Pre-drill using a 3/16" bit. Attach base of Foot Block using one screw at an angle through base and into decking.
26
Rod stiener
22
22.After attached, use a rubber mallet along with scrap piece of
wood to tap Foot Block until it locks into place.
26.Attach tape (qty 6 provided) to alternating sides of the rod stiffener as shown.
27
Rod stiener
23
Installing Lower Rail to Brackets 23. P lace adhesive strips (provided) into bottom rail brackets.
NOTE: Make sure surface is clean and dry.
27. Place rod stiffener inside rail channel.
141
Made with FlippingBook - Online Brochure Maker