Trex® Full Installation Guide

HOW TO INSTALL ROD RAIL STANDARD RAILING/ CONTINUED TREX SIGNATURE®

24

Attaching Foot Block (when required) Required ONLY for All Clear Span Applications over 6' (1.83 m). Included with 8' (2.44 m) railing kits.

20

2

24.Drop assembled rod rail panel into brackets.

Attaching Panel to Brackets 25.Using a 7/64" (0.28

20.Temporarily drop rod rail panel into brackets. To ensure correct location, place Foot Block under center of bottom panel. Mark to provide placement location of base. Once marked remove panel.

25

cm) drill bit, pre-drill at marked location for attachment of railing to bracket. Attach top rail to top brackets by using two self-tapping screws (provided) for each bracket.

2

21

7/64" (.28 cm)

1

NOTE: Pre-drilling is required.

Inserting Rod Rail Stiffener – For Rail Sections Over 6'

26

Rod stiffener

21.Place base (smaller side facing down) on decking surface. Pre-drill using a 3/16" bit. Attach base of Foot Block using one screw at an angle through base and into decking.

22

22.After attached, use a rubber mallet along with scrap piece of

wood to tap Foot Block until it locks into place.

26.Attach tape (qty 6 provided) to alternating sides of the rod stiffener as shown.

27

Rod stiffener

23

Installing Lower Rail to Brackets 23. Place adhesive strips (provided) into bottom rail brackets.

NOTE: Make sure surface is clean and dry.

27. Place rod stiffener inside rail channel.

142 NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.

Made with FlippingBook - Online Brochure Maker