Trex® Full Installation Guide

HOW TO INSTALL ROD RAIL STANDARD STAIR RAILING/ CONTINUED TREX SIGNATURE ®

16

13

3/8"

X" +

13. Cut rods to the length measured in previous step.

IMPORTANT: DO NOT CUT RODS AT RAIL ANGLE; MAKE 90˚ CUTS ONLY!

16. Slide a rod into top and bottom of all verticals. Ensure that distance of top rod to top rail and bottom rod to bottom rail are equal.

14

17

14. Clamp first vertical (lower part of stairs) in place, using width of stair template to position.

17. Clamp top vertical (upper part of stairs) in place, using width of stair template to position.

15

18

15. Clamp middle vertical(s) in place.

18. Mark angle cuts at top and bottom on all verticals.

150 NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.

Made with FlippingBook - Online Brochure Maker