HOW TO INSTALL ROD RAIL STANDARD STAIR RAILING/ CONTINUED TREX SIGNATURE ®
Installing Top and Bottom Rails
19
19. After removing rods and verticals, make angle cuts on top and bottom
23
of verticals following marks from previous step.
23. Install lowest end vertical and all intermediate verticals to bottom rail using ST Wedge Spacer and screws provided.
Vertical and Rod Assembly
24
20
20. Insert anti-rattle strips
into the vertical supports.
NOTE: There are two anti- rattle strips for each support which can only be inserted in one side.
24. Slide rods into lower end and all intermediate verticals.
NOTE: When inserting rods into intermediate supports, keep rods straight to avoid scratching.
21
25
2
1
21. Using the slot on the HZ template, locate marked line and drill two 7/64" pilot holes at each mark (or mark with a punch).
25. Slide upper end vertical onto rods and attach to bottom rail using ST Wedge Spacer and screws provided.
NOTE: Pilot holes will be drilled out larger in next step.
26
22
22. Using pilot holes
(or marks), drill 5/16" holes for all vertical supports in both top and bottom rails.
26. Using a mallet, install bottom rail cover onto bottom rail.
151
Made with FlippingBook - Online Brochure Maker