HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SIGNATURE ®
6
9
9. After attached, use a rubber mallet along with scrap piece of
Upper stair bracket – top rail
1
1
wood to tap Foot Block until it locks into place.
Lower stair bracket – top rail
6. Center upper stair brackets on posts below the marked lines and attach using two #10 x 5/8" self- tapping screws (provided) .
10
11
Attachment of Foot Block (where recommended)
7
10. Set bottom stair rail into bottom stair rail brackets. 11. Set top stair rail into top stair rail brackets.
12
4
2
7. Temporarily set bottom stair rail into brackets. To ensure proper location place Foot Block towards the nose of the stair tread along the side of the bottom rail. Mark location of angle on Foot Block and cut on mark. Then place Foot Block under the center of the bottom rail. Mark placement location of the base.
8
12. TEMPORARILY ATTACH BOTH BOTTOM AND TOP RAIL (IN ONE LOCATION ONLY TO ENSURE RAILS DO NOT MOVE) USING ONE #10 X 1" SELF-TAPPING SCREW (PROVIDED) ON SIDE OF BRACKET. YOU MUST PREDRILL THIS LOCATION FIRST USING 9/64" BIT THAT WAS PROVIDED IN HORIZONTAL MOUNTING KITS.
8. Place base (smaller side facing down) on decking surface. Pre-drill using a 3/16" bit. Attach base of Foot Block using one screw at an angle through base and into decking.