HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SIGNATURE ®
Measuring Verticals
13
16
17
XX"
XX"
13. Using the long edge of the stair template, mark the location of the end verticals on the upper and lower rails.
NOTE: Mark should only be 1" max length or it will be visible after installation of vertical.
16. Determine the angle of the railing (angle should be between 32-37 degrees).
Measuring and Cutting Rail Gaskets
NOTE: This can easily be done with using an angle measurement app on cellular phone or using a speed square.
14
X
17. Measure distance between marks from bottom to top rail.
-1
/2
"
18
X˚ (angle) Side View
Upper vertical channel
Lower vertical
X˚ (angle)
14. Measure distance between marked lines on bottom rail and subtract 1/2" from this measurement.
XX"
XX"
15
X" -1
/2
Lower vertical channel
Upper vertical
X˚ (angle)
18. Ensure the verticals are oriented in the correct location, with the channels facing toward each other. Cut verticals to the dimension and at the angle provided above.
15. Cut both bottom and top rail gaskets to length from previous step.
182 NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.
Made with FlippingBook - Online Brochure Maker