HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SIGNATURE ®
44.Attach bottom stair
42
44
rail to bottom stair brackets using two #10 x 1" self-tapping screws (provided) on each side of bracket. YOU MUST PREDRILL ALL EXISTING LOCATIONS FIRST USING 9/64” BIT THAT WAS PROVIDED
IN HORIZONTAL MOUNTING KITS.
45.Attach top stair rail to top stair brackets
45
using two #10 x 1" self-tapping screws (provided) on each side of bracket. YOU MUST PREDRILL ALL EXISTING LOCATIONS FIRST USING 9/64" BIT THAT WAS PROVIDED
42. .Drop assembled stair mesh rail panel into brackets. Ensure that rails are fully seated into brackets and verticals are completely seated on rails.
Installing Snap-in Channel Filler
IN HORIZONTAL MOUNTING KITS.
43
Attachment of Bracket Covers, Skirts, and Caps
47
46
Signature Post
46.Attach corresponding bracket covers over opening in upper and bottom rails. 47.Attach provided post skirt to bottom of posts when using Trex Signature posts.
43.Cut snap-in channel filler to correct length and install into channels of bottom and top stair rails. Use of a rubber mallet may assist with this step. DO NOT attempt to cut short snap-in pieces with a miter saw. Use an angle grinder or hack saw only.
188
Made with FlippingBook - Online Brochure Maker