HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SIGNATURE ®
44.Attach bottom stair
42
44
rail to bottom stair brackets using two #10 x 1" self-tapping screws (provided) on each side of bracket. YOU MUST PREDRILL ALL EXISTING LOCATIONS FIRST USING 9/64” BIT THAT WAS PROVIDED
IN HORIZONTAL MOUNTING KITS.
45.Attach top stair rail to top stair brackets
45
using two #10 x 1" self-tapping screws (provided) on each side of bracket. YOU MUST PREDRILL ALL EXISTING LOCATIONS FIRST USING 9/64" BIT THAT WAS PROVIDED
42. Drop assembled stair mesh rail panel into brackets. Ensure that rails are fully seated into brackets and verticals are completely seated on rails.
Installing Snap-in Channel Filler
IN HORIZONTAL MOUNTING KITS.
43
Attachment of Bracket Covers, Skirts, and Caps
47
46
Signature Post
1
2
46.Attach corresponding bracket covers over opening in upper and bottom rails. 47.Attach provided post skirt to bottom of posts when using Trex Signature posts.
43.Cut snap-in channel filler to correct length and install into channels of bottom and top stair rails. Use of a rubber mallet may assist with this step. DO NOT attempt to cut short snap-in pieces with a miter saw. Use an angle grinder or hack saw only.
189
NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.
Made with FlippingBook - Online Brochure Maker