HOW TO INSTALL COCKTAIL MESH STAIR RAILING/ CONTINUED TREX SIGNATURE ®
5. Place deck boards over top rails. DO NOT use Enhance deck boards for top
5
8
7
1
rail. PLACE DECK BOARD ON TOP RAIL TO CHECK FOR PROPER FIT AND RAIL CLEARANCE AT BRACKET LOCATIONS. DECK BOARD MAY REQUIRE EITHER A
1
2
7. Use scarf cut for posts where two deck boards meet.
NOTES: » Leave 1/8" (3 mm) gap between deck boards. » Deck boards can overhang end of last post maximum 1/2" (13 mm). 8. Where deck board terminates at upper post, PREDRILL and toenail two approved composite deck screws as shown into post, being careful to avoid hitting stair bracket.
NOTCH CUT ON THE UNDERSIDE OR SLIGHT PLANING ON THE UNDERSIDE TO ALLOW DECK BOARD TO CLEAR TOPS OF BRACKETS AND SIT FLUSH ON TOP OF POSTS AND RAILS. Attach boards on each post with Trex-recommended composite screws (quantity of 2 per each post/ board end).
6
6. Secure boards to top rail using Trex Signature Cocktail Bracket (sold separately). Ensure
NOTE: Top Bracket Covers are not attached in this configuration .
that there is a bracket at each end of the stair railing section, then space brackets approximately every 24" and attach with 4 screws provided.
NOTE: Pre-drilling before attachment is recommended.
191
Made with FlippingBook - Online Brochure Maker