HOW TO INSTALL HORIZONTAL CABLE RAIL/ CONTINUED TREX SIGNATURE ® X-SERIES ™
NOTE: Install X-Series Anchor Posts as per instructions provided with these posts. Then proceed to instructions below.
Installing Pass-Through Posts » X-Series Horizontal Cable Rail is designed to be installed at a maximum clear span of 6', 12', or 18' between X-Series Anchor Posts. » If not installing standard clear spans as listed above, you must first calculate the clear span between X-Series Anchor Posts, then divide accordingly, depending on total overall span.
– Any span over 6’ will require the use of one Pass-Through Post. – Any span over 12’ will require the use of two Pass-Through Posts.
Post Placement
1
18' Post Placement
Anchor Post
Pass-Through Post
Pass-Through Post
Anchor Post
6' (183 cm) Center to Inside
6' (183 cm) Center to Center
6' (183 cm) Inside to Center
18' (549 cm)
12' Post Placement
6' (183 cm) Inside to Center
6' (183 cm) Center to Inside
12' (366 cm)
6' Post Placement
6' (183 cm) Inside to Inside
1. Install Pass-Through Posts using mounting hardware provided. When mounting Pass-Through Posts to pressure-treated wood framing, follow the same installation method and blocking details outlined in the Trex Signature X-Series Post installation instructions. Ensure Pass-Through Posts are plumb.
197
NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.
Made with FlippingBook - Online Brochure Maker