Trex® Full Installation Guide

HOW TO INSTALL STAIR CABLE RAIL TREX SIGNATURE ® X-SERIES ™

Measuring and Cutting Top Rail

Inserting Brackets onto Top Rail

10

12

10. Slide compound swivel brackets into top and bottom X-Series Anchor Posts.

12. After removing compound swivel brackets from X-Series Anchor Posts, insert brackets onto top rails rail as shown. Ensure that all brackets are fully seated.

101

Pre-Drilling Top Rail at Bracket Locations

13a

X

13a. Using a 9/64” drill bit, pre-drill at all bracket locations as shown.

Note: Only pre-drill through the first layer of the rail and bracket.

13b

13b. Install #8 x 1/2" screw into compound swivel bracket at top post location only.

Cut Length = X + 5/8"

11. Clamp top rail to side of X-Series Anchor Posts, ensuring that top rail is running parallel to the stairs. Adjust each compound swivel bracket to align with direction of top rail and hand-tighten screws using a 5/32" Allen wrench to temporarily stabilize the brackets. Measure between the brackets as shown, add 5/8" and cut top rail to this length.

211

Made with FlippingBook - Online Brochure Maker