HOW TO INSTALL STAIR CABLE RAIL TREX SIGNATURE ® X-SERIES ™
Centering Cable Brace
23
3
2
1
1
23 Locate the center of the span and slide cable brace to its center position. Ensure that cable brace is straight/ vertical, and then tighten both top and bottom set screws using a 3/32” Allen wrench.
Fastening Top Rail to Bracket at Bottom Post
Cutting and Installing Top Inserts
25
24
24. Install #8 x 1/2" screw into compound swivel bracket at bottom post location.
2
3
1
25. Use the leftover cut pieces of the cable infill adapters to fill the open channel above each bracket in the X-Series Anchor Posts by trimming each piece to be flush with the top of the post as shown.
216
NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.
Made with FlippingBook - Online Brochure Maker