Trex® Full Installation Guide

HOW TO INSTALL COCKTAIL STAIR RAILING/ CONTINUED TREX SELECT ®

12

Attaching Deck Board to Select Top Rail 12.Place inverted Select top rail (orient properly so baluster holes are shown top side up), on the deck board so the angled cuts will align properly along with centering the top rail on the deck board. 13. Secure deck board to Select top rail with 3/4" screws provided approximately every 16" on center. Screws are to be installed inside of the baluster holes into the decking board. NOTES: » DO NOT overtighten. » Note that a long drill bit

15. Attachment of Top Rail to Post See instructions on page 254.

Attachment of Deck Board to Post 16. Attach deck board to lower post with Trex- recommended composite screws (quantity of 2 per each post/board end).

16

13

17. Where deck board

17

terminates at upper post, PREDRILL and toenail two approved composite deck screws as shown into post, being careful to avoid hitting stair bracket.

will be required to fit inside the baluster holes. » If installing 8' rail section and using the Aluminum Rail Stiffener, predrilling will be required through the stiffener.

Installation of Foot Block 18. Attach foot block per foot block instructions.

14. Installing Balusters See instructions on page 254.

HOW TO INSTALL TRADITIONAL STAIR RAILING TREX SELECT ®

1. Installing Pressure-Treated Posts See instructions on page 252.

2. Installing Post Sleeve Skirts and Post Sleeves See instructions on page 252.

3. Measuring and Cutting Bottom Stair Rail See instructions on page 252.

4. Marking Location for Foot Block to Bottom Rail See instructions on page 253.

5. Attaching Brackets to Bottom Rail See instructions on page 253.

256 NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.