HOW TO INSTALL MESH STAIR RAILING TREX SELECT ®
4
6
Attaching Brackets to Bottom Rail 6. Snap the top stair adaptor bracket (labeled TOP) to the standard bracket. Repeat for remaining bottom bracket.
TIP: Use a dap of super glue when snapping bracket together. This will help stabilize bracket when installing.
4. S et bottom rail on top of deckboard. Mark rail at post locations and cut bottom rail. ENSURE POSTS ARE PLUMB BEFORE CUTTING RAILING.
7
NOTE: For any rail lengths over 6' AND when using aluminum rail stiffener, remove this from the top rail and cut the stiffener 4" shorter than the top rail cut length.
Top Rail
4" (102 mm)
2
4
IMPORTANT NOTE REGARDING FOOT BLOCK INSTALLATION: » R efer to detailed instructions (Trex Select rail instructions) included with foot block prior to installation of
7.
O n the BOTTOM RAIL, attach the assembled bottom stair brackets to the OPPOSITE SIDE of the baluster holes. Attach both brackets using three #8-18x1" selfdrilling screws (provided).
Attachment of Bottom Rail to Post
railing section as these include other required steps for proper installation.
NOTE: For attachment of brackets to posts, use at least a 3" long drill bit or extension so as to not damage sides of rails when installing.
Marking Location for Foot Block to Bottom Rail
5
TIP: Pre-drill prior to screw installation using a 7/64" drill bit
8a
8a. K eeping deck board on stair treads,
center bottom rail between posts and attach bottom rail stair bracket to upper post using two #9-16 x 3" wood screws (provided).
1
4" (10 cm)
2
5. M ark approximate location for foot block, allowing a measurement of 4" maximum. Invert the bottom rail, and at marked location drill a hole using a 3/16" drill bit in the center of the channel. Foot block is to be installed at last step.
275
Made with FlippingBook - Online Brochure Maker