Trex® Full Installation Guide

HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®

8b

9b

8b. A ttach bottom stair rail stair bracket to lower post using two #9-16 x 3" wood screws (provided) . (deck board can now be removed).

IMPORTANT NOTE: SET DRILL TO LOW SPEED AND LOW CLUTCH SETTING WHEN INSTALLING THESE SCREWS. DO NOT USE IMPACT DRIVER. Mark Location for Top Rail Height and Mark Location for Cutting Top Rail

9b. M ark top rail at intersection of posts. Do not remove top rail until after step 10.

9a

clamp

Cutting and Installing Vertical Channels

tape

10

36" or 42"

36" or 42"

36" or 42"

36" or 42"

9a. M easure up from front/nose of stair treads as listed above depending on your rail height. Ensure that the measurement is the same at each location. Temporarily clamp top rail in this location, ensuring its parallel to bottom rail. Use a removable tape to mark intersection at top and bottom post. Do not remove top rail until after step 10.

10. W ith top rail still in place, align vertical channels against the inside of each post, mark at intersections on top and bottom rails and cut at these locations. Remove the top rail.

276 NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.

Made with FlippingBook - Online Brochure Maker