Trex® Full Installation Guide

HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®

Installing Vertical Channels

Installing Bottom Channel

11

13

6' Section = Minimum 4 screws 8' Section = Minimum 5 screws

13. Center and install bottom channel using #8-18 x 1 1/4" self-drilling screws (provided), minimum 4 screws for 6' section and 5 screws for 8' section. Measuring and Cutting Top and Bottom Anti-Rattle Gaskets

11.  Center vertical channel between posts, and attach screws into channel using three #8-18 x 1/14" self- drilling screws (provided). Install lower and upper screws approximately 1" from each end of channel. Center and install remaining screws.

14

Measuring and Cutting Bottom and Top Channel

12

X+1"

12.  Align bottom and top channel so they run parallel to bottom rail, mark at location where these intersect with the side verticals, and cut both bottom and top channel to this length.

14.  Using same measurement from top/bottom channels (see step 12, add 1" and cut top and bottom anti-rattle gaskets to this measurement).

NOTE: Both sides will have to be cut to accommodate angle.

277

Made with FlippingBook - Online Brochure Maker