HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®
Measuring and Cutting Top Channel
Install Mesh Caps
21
19
19. With top rail still in place align top channel so it runs parallel to the top rail, mark at locations where this intersects with the side channels as shown, and cut.
21. Install mesh caps on all cut ends.
Install Anti-Rattle Gaskets onto Mesh
22
20
6' Section = Minimum 4 screws 8' Section = Minimum 5 screws
20. Remove top rail, and center top channel between slots in brackets and centering on rail (NOTE: There may be a slight gap on each end between brackets and channel), and install using #8-18 x 1 1/4" self-drilling screws (provided): Using minimum 4 screws for 6' section and minimum 5 screws for 8' section.
22. .Install top and bottom gaskets onto mesh panel, followed by side gaskets. Make sure all gaskets are centered and fully seated.
279
Made with FlippingBook - Online Brochure Maker