HOW TO INSTALL ENHANCE STEEL RAIL HORIZONTAL PANEL/ CONTINUED
Attaching Brackets if using Pressure-Treated Posts with Transcend 6x6 Post Sleeves
5
4
1
Install 1-Piece Skirt and Post Sleeve 1. S lide 1-piece skirt down to rest on decking surface. Slide post sleeve
over post and position inside post sleeve skirt.
2
3
2" (5.1 cm)
4. C enter lower bracket on post above the marked line and attach using two #10 x 2.5" high carbon steel coated black screws (not provided) . 5. Center upper bracket on post above marked line and attach using two #10 x 2.5" high carbon steel coated black screws (not provided) .
33-1/4" (84.5 cm) or 39-1/4" (99.7 cm)
2. Measure up from top of skirt 2". Mark with light line. 3. M easure up from top of skirt 33 3/4" for 36" rail height or 39 3/4" for 42" rail height. Mark with light line.
KEY Mark Cut
KEY
How to Measure and Cut Panel Rails (When REQUIRED)
2
1
1/4 " (6 mm)
1/4 " (6 mm)
1. P osition panel between posts and ensure there is equal distance on each of the end balusters and posts, as well as allow 1-1/2" on each side of rails to allow for attachment to brackets.
2. U sing a saw with metal blade, cut ends of both bottom and top rails 1/4" shorter on each side to allow for fit into brackets.
298
Made with FlippingBook - Online Brochure Maker