HOW TO INSTALL HORIZONTAL RAILING POST TO POST/ CONTINUED TREX SIGNATURE ®
16
18
19
Trex Signature ™ post ®
16. U sing a 7/64" (0.28 cm) drill bit, pre-drill through railing into bracket as shown for attachment of railing to bracket. Attach upper rail to each bracket by installing screws diagonally
2
7/64" (.28 cm)
1
through upper rail into bracket using two self- tapping screws each side (provided) .
18.A ttach corresponding bracket covers over opening in upper and bottom rails. 19.Attach provided post skirt to bottom of posts when using Trex Signature posts.
NOTE: Pre-drilling is required. It's best practice to pre-drill a single hole, then attach screw, and continue in this order.
20
21
17
® Trex Signature ™ post
Post sleeve
20. A ttach post caps to Trex Signature posts. (Use of rubber .mallet may be required for secure attachment.) 21.Attach post caps to post sleeves using external grade PVC construction adhesive (apply adhesive on the inside self-centering/corner tabs).
17. A ttach “crowned" upper rail cover to upper rail by aligning cover on one side of rail. Then starting from one end of rail, snap cover onto opposing slot work- ing down length of rail. GENTLE tapping with a rubber mallet may facilitate fastening.
86
NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.
Made with FlippingBook - Online Brochure Maker