HOW TO INSTALL TREX SIGNATURE ® COCKTAIL RAILING
7. Attaching Center Baluster to Bottom Rail See instructions on page 85 - Post-to-Post, page 89 - Post-to-Crossover Post, or page 93 - Crossover Post-to- Crossover Post.
8. Attaching Foot Block (when required) See instructions on page 86.
9. Attaching Bottom Rail Cover and Bottom Rail to Brackets See instructions on page 85 - Post-to-Post, page 89 - Post-to-Crossover Post, or page 93 - Crossover Post-to- Crossover Post. 10. Installing Remaining Balusters into Bottom Rail See instructions on page 86 - Post-to-Post, page 90 - Post-to-Crossover Post, or page 94 - Crossover Post-to- Crossover Post. 11. Attaching Top Rail and Top Rail Cover See instructions on page 87 - Post-to-Post, page 90 - Post-to-Crossover Post, or page 94 - Crossover Post to- Crossover Post.
IMPORTANT NOTE: » ONLY for use with pressure-treated 4x4 post (3.5" nominal square) and 4x4(102 mm x 102 mm) post sleeve. Trex Signature posts, Trex post mounts or joist mount posts cannot be used with Trex Signature Cocktail railing. Cutting post and post sleeve only apply to the Cocktail style railing. 1. Installing Pressure-Treated Posts, Post Sleeves,and Skirts to Use with Trex Signature Railing See instructions on page 78 .
NOTE: Top Bracket Covers are not attached in this configuration.
Cutting Post and Post Sleeve 2. Mark and cut post and post sleeve measuring from deck surface: » 36-1/32" (915 mm) for 36" (914 mm) height. » 42-1/32" (1068 mm) for 42" (1067 mm) height.
2
12. Attaching Deck Board to Top Rail Place deck boards ( DO NOT use Enhance deck boards for top rail) over top rails. Attach boards on each post with Trex-recommended composite screws (quantity of 2 per each board end).
12
36-1/32" (915 mm) or 42-1/32" (1068 mm)
2
3. Installing Horizontal Fixed Brackets See instructions on page 81. 4. Installing Horizontal Swivel Brackets See instructions on page 98.
13
13. Secure boards to top
rail using Trex Signature Cocktail Bracket (sold separately). Ensure that there is a bracket at each end of the railing section, then space brackets approximately every 24" and attach with 4 screws provided.
5. Cutting Railings for Horizontal Fixed Brackets See instructions on page 84 - Post-to-Post, page 88 - Post-to-Crossover Post, or page 91 - Crossover Post- to-Crossover Post. 6. Cutting Railings for Horizontal Swivel Brackets See instructions on page 99.
End View
NOTE: Pre-drilling before attachment is recommended.
95
NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.
Made with FlippingBook - Online Brochure Maker