The investment costs for materials, installation work, and excavation/backfilling can be adjusted, so they comply with the energy company in question. See below as an example of the calculation result:
The energy company also has the possibility of comparing two different pipe scenarios and calculate the return on investment, ROI, by investing in a system with a lower heat loss.
If the analyses of the pre-defined system show that it is interesting to the energy company to choose another insulation series, TwinPipe instead of single pipe, or a pipe produced after a specific method, detailed calculations of the Total Cost of Ownership of specific projects can be carried out by means of available tools.
Peter Jorsal, pjo@logstor.com For further information please contact: