2021 ICCD Annual Report

Building the stream pipe

Installing french mattress

After installing stream crossing

PROJECT SUMMARY AND RESULTS The project included replacing a three-foot stream pipe on an unnamed tributary to South Branch Two Lick Creek with a 14-foot box culvert, improving a wetland crossing pipe with a four-foot squash pipe (previously 24 inches), and installing a 158 square yard French mattress in between the two. Green Township also worked with the adjacent landowner in order to install three stabilization structures for high flow events.

FUNDING SOURCES AND PROJECT COSTS $112,872.34 — ICCD Dirt & Gravel Road grant funds $1,097 – Green Township in-kind contributions

11

2021 Annual Report

Made with FlippingBook Digital Publishing Software