Board Converting News, May 18, 2020

Valco Melton Offers SealTak For E-commerce Packaging

Under Roof Separators... ...Made Simple

The spread of the COVID-19 across the world has altered purchasing habits while amplifying an already growing trend in e-commerce. In line with the mobility restric- tions that our societies are enduring, online commerce remains as a solid ally. As a supplier to the corrugated and folding carton industries for hot and cold gluing and quality assurance

systems, Cincinnati, Ohio based Valco Melton is offering Seal- Tak, a multiple application solu- tion package for e-commerce products. This includes the ap- plication of pressure sensitive hot melt adhesive and release liner for easier peel and seal (re- places transfer tape), the appli- cation of tear tape and optional

T ANGENT A IR ® Energy conservation is realized when the TangentAir ® is combined with one of our filtration units. Eliminate problems with rotary airlocks and belt con- veyors delivering trim to your balers in new or exist- ing installations with ACC’s patented TangentAir ® . For more information please visit our website: www.accfilter.com

cold glue equipment for in-line cross gluing – a complete solution from one single brand. The company claims that by eliminating the use of double-sided tapes, Sealtak technology brings the benefits of an improved easy peel and seal feature, a stronger bond, reduced downtime, high speed and efficiency and cost savings. Visit valcomelton.com for more information.

A IR C ONVEYING C ORPORATION P H : 901-454-5016 F AX : 901-324-7979 e-mail: sales@accfilter.com

1 Hour, Low Cost Saturn IDT terminal upgrade

Over 80+ already installed !

Actual IDT upgrade installion photo to Saturn that also had a IMC Pacesetter upgrade

Langston uses an IDT terminal for operator interface to the Saturn’s PLC5 control. This design is more than 20 years old, the replacement cost is high and it’s still an obsolete device design . IMC’s FlexoView is a low cost upgrade based on a reliable modern PC based HMI design.

Call for a free upgrade quote and user reference list...

a Install by your plant personnel in about 1 hour a No learning curve - FlexoView is a direct replacement a More reliable design - lowest maintenance cost a Lowest price Langston set-up control upgrade a Most Experience - set-up controls are ALL we do

423 Commerce Lane - Unit 6 | West Berlin, New Jersey 08091 | Tel. (800) 462-8660 | www.imcbox.com | cschipke@imcbox.com

22

www.boardconvertingnews.com

May 18, 2020

Made with FlippingBook Online newsletter