2023 Master Plan

Appendix L

Maintenance Level Guidelines

8.1 Surfacing The surface is smooth, level and well drained with no standing water (nickel test). The surface will be free of large cracks, holes and trip hazards. It will be painted and striped in accordance with the United States Tennis Association court specifications. Worn paint surfaces do not exceed 20% of total court surface. The surface is free of litter, debris, gravel, leaves and graffiti. It may require weekly blowing. 8.2 Nets Nets will be installed at the proper height and tie-downs will be in place. Net height at center court is 36” and 42” at the sid e posts. Nets will be free from tears and frays. Support poles must have hardware intact, properly anchored and installed. Nets will be checked for net tension and/or damage weekly, May 1 to Oct 31, and bi-monthly, November thru April 30 th . 8.3 Fencing Fences will be inspected for holes, protrusions, and looseness. Fencing material is galvanized chain link and is the appropriate gauge wire for specified use. The fencing material is properly secured to the support rails and the support rails are properly connected and straight. The fabric is straight and free of bending or sagging. Gates will be checked to insure proper working order of the hinges and latches. Widescreens (where provided) are tightly secured to the fencing and are free of tears and holes. 8.4 Lighting Electrical systems and components are inspected to insure operation and compliance with appropriate building code. Ninety percent of lamps for each court are operational; timers are properly set for specific hours of operation. No electrical conducting wires are exposed; ballast boxes and components are properly installed and secured. Lights give uniform coverage on the courts and fixtures are adjusted to eliminate dark or blind spots. Lighting controls with operation instructions and information are conveniently located for easy access. 8.5 Litter Receptacles Litter receptacles will be provided at convenient locations and are emptied weekly at a minimum between May 1 and October 31; bi-monthly from November 1 to April 30. 8.6 Signage Court signage will be in place by all gates. 9.0 Basketball Court Maintenance Basketball courts maintenance will involve surface backboard, rim and net maintenance. 9.1 Surface

20

398 Naperville Park District | 2023 MASTER PLAN

Made with FlippingBook - Share PDF online