Maintenance Level Guidelines

The surface is smooth, well drained in order to pass the nickel test. The surface will be free of large cracks, holes and trip hazards. The surface is painted and striped as per court specifications; worn painted surfaces do not exceed 20% of the total court surface. The surface will be free of litter, debris, gravel and graffiti. 9.2 Rims, Backboards and Nets Rims and backboards are level with hardware intact, rims and backboards are painted. Nets are properly hung and are replaced when torn or tattered. Support poles are secure in the ground and straight, free of cracks or dents. 9.3 Litter Receptacles Litter receptacles will be provided at convenient locations and are emptied weekly at a minimum between May 1 and October 31; bi-monthly from November 1 to April 30. 9.4 Lighting Electrical systems and components are inspected to insure operation and compliance with appropriate building code. Ninety percent of lamps for each court are operational; timers are properly set for specific hours of operation. No electrical conducting wires are exposed; ballast boxes and components are properly installed and secured. Lights give uniform coverage on the courts and fixtures are adjusted to eliminate dark or blind spots. Lighting controls with operation instructions and information are conveniently located for easy access. 10. Sand Volleyball Maintenance Activity includes all maintenance tasks related to volleyball courts such as daily raking of the sand, net set-up and take down and monthly inspections. Maintenance Level Guidelines 10.1 Nets Nets will be installed securely to the support poles and are hung properly at the specific height. Support poles are properly anchored with no exposed footings. Nets will be free from holes and are not torn or tattered. 10.2 Surface The court surface is loose sand, with no standing water. Surface is free of weeds, grass, litter and debris. Sand is added or tilled as needed. The surface is dragged daily to maintain a level surface between May 31st and September 15th. 11. Playground Service Activities include weekly inspection and repair of equipment and care of mulch, pour-in-place, or sand surfaces surrounding the equipment. Maintenance Level Guidelines

21

399

Naperville Park District | 2023 MASTER PLAN

Made with FlippingBook - Share PDF online