2023 Master Plan

Appendix L

Maintenance Level Guidelines

TABLE OF CONTENTS

STAFF SCHEDULES AND PAY

SECTION 1

Winter Work Schedule Mandatory Overtime

1-1 1-1 1-2

Mechanics Weekend Call-Out

ICE RINK OPERATIONS

SECTION 2

Outdoor Ice Rinks: Construction, Maintenance and Operations

2-1 2-1 2-1 2-2 2-2 2-3 2-3 2-3 2-5 2-5 2-6 2-6 2-7 2-8 2-9

Service Levels – Class A Rink Service Levels – Class B Rink Ice Rink Design Criteria

The Fall Preparation

Method of Ice Rink Construction

Flooding Spraying

Ice Surface Maintenance

Hose Repair

Patching Holes in Ice Rink

Hose and Equipment Needs per Ice Rink Location

Night Shift Responsibilities

Centennial Basin Lights – Keypad Description Daily Ice Rink Condition Report Form Daily Ice Rink Condition Criteria

2-10 2-10 2-11 2-11 2-11 2-11 2-12

Removing Snow from Rinks

Problems with Fire Hydrants Operation of Water Equipment

Fire Hydrant – Set Up

Breakdown

In Case of Frozen Hydrant

SLED HILL OPERATIONS

SECTION 3

Sled Hill Operation

3-1 3-2 3-3

Daily Sled Hill Report Form

Sled Hill Listings

SNOW REMOVAL OPERATIONS

SECTION 4

South Parks Central Parks North Parks

4-1 4-2 4-3 4-4 4-4 4-5 4-6 4-7

Trades

Salt Usage

Deicing Application Rate Guidelines for Parking Lots and Sidewalks

Deicing Application Rate – Chemicals NPD Parking Lots Information – Salting

SNOW REMOVAL EQUIPMENT Key Points to Check – John Deere Brooms/Blades

SECTION 5

5-1 5-2

Snow Removal Equipment Operation – Reminder of Do’s and Don’ts.

418 Naperville Park District | 2023 MASTER PLAN

Made with FlippingBook - Share PDF online