Appendix M
2020 Trails Master Plan Update
Wolf’s Crossing Community Park (Formerly Southwest Community Park) Year: 2020 Trail type: Asphalt Distance: Approximately 1.75 miles
As the last remaining large‐scale parcel of land in Naperville available for park and recrea�on ameni�es, Wolf’s Crossing Community Park started construc�on in 2019 and will reach substan�al comple�on in the fall of 2020. A large loop trail is included within the park, along with internal trails linking the many offerings contained at Wolf’s Crossing. Addi�onally, Park District staff worked with Forest Preserve District of Will County staff and ComEd to establish trail connec�ons within the ComEd Right of Way to reach the exis�ng Tall Grass Greenway trail in FPDWC’s Vermont Cemetery Preserve.
Per the 2008 Plan: Southwest Community Park “As recommended in the Park District’s 2007 Open Space and Recrea�on Master Plan, future trails should be constructed within the future Southwest Community Park. �n addi�on to internal trails, connec�ons with the larger regional trail system should be made from this park” (Houseal Lavigne, p. 20).
2020 Trails Master Plan Update | 9
532 Naperville Park District | 2023 MASTER PLAN
Made with FlippingBook - Share PDF online