2023 Master Plan

Appendix M

2020 Trails Master Plan Update

Atwater Subdivision Year: 2018 Trail type: Asphalt Distance: Approximately 3.8 miles

In addi�on to dona�ng two separate parcels� Atwater developer Pulte installed an asphalt trail system (built to the Park Districts speci�ca�ons) that is maintained by the Atwater HOA. The trail system is public and provides a connec�on to the Illinois Prairie Path.

(Image provided by Pulte)

2020 Trails Master Plan Update | 13

536 Naperville Park District | 2023 MASTER PLAN

Made with FlippingBook - Share PDF online