Appendix M
2020 Trails Master Plan Update
Future Trails by Naperville Park District Future NPD Trail Work (per budget detail) 2021 Prairie School/Park – renovate internal sidewalk
Hobson West Ponds – new shelter, picnic tables, site furnishings, ADA accessible concrete pad and sidewalk 2022 Kendall Park – Renovate sidewalk, install bike racks (possible CDBG grant) (per budget detail) (Please note Kendall Park is leased from the City of Naperville.)
Pioneer Greenway – Renovate trail, sidewalk, and benches
2024 DuPage River Park – Renovate boardwalk por�on of bridge/trail
Year TBD Wil‐O‐Way Park – the City of Naperville contacted the Park District about adding a Right of Way sidewalk to the park along Jefferson Avenue, closing an e�is�ng gap from Birchwood Drive west to Whispering Hills Drive. �ron�er Sports Comple� – as requested by parks staff, a small asphalt path connec�on on the west side fields #5 and #6 will take place and link to the e�is�ng asphalt system in �ron�er. Country Lakes Park – the City of Naperville an�cipates installing a light at the intersec�on of North Aurora Road and Weston Ridge Drive, the southeast side of Country Lakes Park. The Park District is considering adding a parking lot at this loca�on and should consider a trail connec�on from the lot to the e�is�ng asphalt trail in the park. Addi�onally, the District should request or work with the City to install a Right of Way sidewalk along the length of the park ad�acent to North Aurora Road mee�ng at Genesee Drive. Hobson Grove – should the opportunity arise, consider adding a Right of Way sidewalk along Olesen Drive along the eastern side of Hobson Grove. Removals from 2008 Plan Hobson West Ponds was iden�fied as a candidate for a loop trail system in the original Trails Master Plan. A�er considera�on over several years, it is determined that an ADA loop trail system will not work in this loca�on due to the e�is�ng condi�ons at the site. A mowed trail is a possibility to complete the loop, but a hard, accessible surface is una�ainable.
2020 Trails Master Plan Update | 15
538 Naperville Park District | 2023 MASTER PLAN
Made with FlippingBook - Share PDF online