Features & Benefits
Easily identifiable for post installation inspection
Meets relevant requirements and certification - NHBC, BBA, UKCA & CE
Force fit installation (no nails or mastic sealant required , or need to trim joists to fit)
Fire tested up to 60 mins In compliance with approved document B
Meets the sound requirements of a proprietary joist cap as specified by Appendix A, Robust Details Part E Handbook
Compliance Part L air tightness requirements - 68% more efficient than NHBC end seal detail requirements
1.02 m3/h
(+209%)
0.33 m3/h
New Cullen Hi-Vis Gripper
NHBC detail with mastic (minimum requirement)
To find out more about the features and benefits please scan the QR code to our new HV-GR features and benefits video Features & Benefits Video
The latest version of the technical guide will always be the digital format on our website.
Technical support: 01592 771132 / technical@itwcp.com / https://www.itwcp-offsite.co.uk 3
Made with FlippingBook - Online catalogs