Cullen Hi-Vis Gripper Technical Guide 2025

Installation Instructions

Installation Instructions

1

2

7

8

Fold the HV-GR to create a spine and a gap between the two halves

HV-GR has been installed onto the joist and is ready for the mortar and blockwork to be added to finish the installation

3

4

Single joist Installation Video

Double joist Installation Video

Triple joist Installation Video

Slide the HV-GR on at an angle and apply some pressure to bend the bottom tabs

From here push evenly on HV-GR to slide it onto the joist

5

6

Scan the QR code to see our new single joist HV-GR installation video

Scan the QR code to see our new double joist HV-GR installation video

Scan the QR code to see our new triple joist HV-GR installation video

The latest version of the technical guide will always be the digital format on our website.

The latest version of the technical guide will always be the digital format on our website.

4

Technical support: 01592 771132 / technical@itwcp.com / https://www.itwcp-offsite.co.uk 5

Technical support: 01592 771132 / technical@itwcp.com / https://www.itwcp-offsite.co.uk

Made with FlippingBook - Online catalogs