Clarendon Homes Signature Promotion Brochure

SAPPHIRE COLLECTION

Laundry and Storage (Continued)

Standard Inclusion

Free Upgrade

External Laundry Door

Clear glazed Corinthian AWO21 external laundry door in painted finish with Gainsborough lockset and deadbolt.

Linen Cupboard

Linen cupboard as shown on masterplan with four melamine shelves.

Choice of cabinetry handles from standard nominated range.

Handles

Walk-in wardrobes to bedrooms where shown on master plan, flush panel hung doors to built-in wardrobe for remaining bedrooms. Melamine shelf and hanging rail to all wardrobes.

Wardrobes

Chrome floor wastes.

Included

Other Home Inclusions

Gas connection (subject to availability). Continuous flow gas hot water system. Light points including compact fluorescent globe.

Electricity & Gas

Smoke detectors provided (direct wired with battery backup). Earth leakage electrical safety switch in single phase meter box. 2x TV and 2x phone points. Additional 2x TV and 2x data points.

201-day Tender period from date of deposit, with option to extend to 270 or 365 days for a nominated fee. For a limited time, 12 months Tender period from date of deposit. Finance your new home with Clarendon and receive a $500 Visa Eftpos card. 90-day maintenance period. Pest control certification. Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per OH&S requirements, subject to site conditions. Site security fencing as per OH&S requirements (subject to site conditions - up to 30 linear metres included). An appointment with one of our expert Lifestyle Studio Consultants to assist with your colour selections and inclusions. Construction insurance premium (home owner’s warranty).

Special Inclusions

Structural engineer’s certificate for concrete slab. Water Authority fees (regular connections only). Initial surveyor’s and engineer’s fees. Site contour survey and plan and identification survey. Soil test by engineer. All weather access control point (basic allowance). Sediment control fencing as required by Council. **BASIX assessment to State Government requirements. Development application and construction certificate fees. Long service levy. Trade waste compound as required by Council.

Your Tender Includes

CLASS “M” or “H1” Australian standard engineered slab. (as nominated by the engineer) Standard BASIX requirements with up to 3000L slimline water tank. *1 Standard council fees and requirements. Earthworks: provide balanced cut and fill up to 1.0m to achieve a level building platform. Piering allowance. Concrete pump. Water service connection. *2

Mandatory Building Require - ments

Sewer connection to junction at front/rear within boundary. *2 Provide 100mm stormwater connection to street/easement. *2 Underground power - 3 phase provision included (where available). *2 Standard security fencing. 10.7 Certificate. Waste Management Plan. Erosion and Sediment Control Plan. Neighbour Notification Plan. Tiling to front porch.

The Sheridan 36 with Sapphire Inclusions with optional upgrades displayed.

38

39

SIGNATURE PREMIUM UPGRADES

Made with FlippingBook Publishing Software