The Ucross Art Gallery & Conference Center | Ucross Foundation Clearmont, WY
Year Built: 1882 Size: 13,000 sq. ft. Existing Heating System: 2 propane boilers New Heating System: 2 GARN® WHS 2000 units located in existing 2-car shop/garage • Four packaged terminal units provided heating and cooling to four separate offices on the lower level. • Replaced existing air handlers and coils, several pumps, all controls and some duct. Wood Source: Cotton wood, standing dead, and downfall – all harvested locally. Construction Start/End: November, 2007 – July, 2008 Annual fuel savings: 2,500 gallons of propane Project Manager and Overall Concept: Martin Lunde, PE, Dectra Corporation HVAC Design: McKinley Wood, PE Construction Supervision: Ken Thorpe, Powder River The Ucross project was funded by the Ucross Foundation, through generous support from Ucross Founder Raymond Plank, with the on-site personnel support of: Director Sharon Dynak, maintenance guru Mike Latham and other Ucross staff.
Page 1Made with FlippingBook - professional solution for displaying marketing and sales documents online