Processes 2021 , 9 , 274
19of 24
( a )
( b ) Figure5. The Gantt charts of Job8, ( a , b ) are Gantt charts of the first and second operation of Job8 respectively; the makespan and energy cost of NSGA-II, SPEA2, MOEA/D-MR, and IMOEA/DTL are (2.3041 × 10 4 , 1.9083 × 10 6 ), (2.3147 × 10 4 , 1.9133 × 10 6 ), (2.3112 × 10 4 , 1.9117 × 10 6 ), and (2.3017 × 10 4 , 1.9041 × 10 6 ), respectively.
Made with FlippingBook - Online magazine maker